>> 完工后(一般)可开始使用的许可时间:
24小时后可上人,72小时后可承载重物;7天后可用水清洁。.
>> 达到理想硬度所需时间:
7天以后,地坪性能完全稳定,达到理想的硬度。
>> 保持清洁卫生:
树脂地坪使用中需要保持清洁卫生:a.砂尘颗粒、坚硬物料的碎颗粒等,需及时清扫,以免经碾压后划伤地面。b.人员自室外进入车间不
要带进砂尘。c.室外及仓库内、外用不同的叉车作交接:室外使用的叉车不要进室内,室内的叉车不要出来,以防砂尘带入室内。d.完工
7天后的地坪可用清洁剂及水对表面渍污进行清洗。
>> 避免撞击和划伤:
避免超重的机器、物件直接撞击地面;避免尖锐的器件划伤地面;(如有叉车、手推车金属支架的座椅等,应使用橡胶轮子及橡胶腿垫)。
>> 及时清除油污和溶剂:
树脂地坪虽有一定的耐酸碱性能(防腐地坪除外),但也需妥善护理,如有水、酸性或碱性溶剂、机油等积于地面,应及时清理,最好不超
过24小时。
>> 可进行打蜡处理,作用:一更便于清洁,二是可弥合划痕。
>> 新完工地坪的特别保护:
未启用之厂房,如需有其它施工单位进行后期安装、装修等工作,工程进行时要采取相应的保护措施:
a.人员及物料最好只从1个出入口出入。
b.出入人员必须除鞋或换干净拖鞋。
c.无论人员或物料进出,均不得将泥、砂等带进现场。
d.不得有硬物在地面拖行。
e.作业(例如电焊、刷天花板等)地点一定要铺垫隔挡材料,避免损坏、弄脏地坪。
f.最好有保安值班,进行全天候监督。
>> The
time for using safely after finishing (general):
Walking on and bearing was not allowed 24h
and 72h respectively after finishing. Clearing
with water was allowed only after the floor
was finished 7 days.
>> The
time for reaching the ideal rigidity and climate-resistant:
The function of the floor coating system was
up to the ideal rigidity and climate-resistant
stability completely after finishing 7 days.
>> maintaining
cleanness and sanitation:
Cleanness and sanitation are necessary in
the process of using resin floor :a. To avoid
scraping by grinding and rolling, clearing regularly
is necessary if there are sands、grits、dusts
and other granules of rigid material on the
surface of the floor.b. Paying attention not
to bring grit and sand into workshops when people
entrant in.c. Different cranes should be used
where the inner and the outer of the workshops
and storehouse to avoiding scraping.d. The water
and detergent were allowed to use to cleaning
the floor only after being finished 7 days.
>> Guard
against striking and scraping
a.Do not striking directly by the over-weight
machine and things.
b.Do not scraping by the keen-edged things.
c.Cranes、barrows 、big chairs and metal frames,
if used, should be fitted with rubber wheels
or rubber braces.
>> Clearing
waste oil and chemistry solvent in time:
Epoxy floor need to maintain clean carefully
although it can resist acid and alkali in some
degree. All the waste water、 oil、acidic and
alkaline solvent should be cleaned as soon as
possible, removing them within 24h is preferred.
>> Waxing
the Epoxy floor regularly is not only convenient
to clear but useful for mending and closing
nicks.
>> The
floor just finished need to be protected specially.
To the workshop with the floor just finished,
it is usual for many other companies to enter
to make installation and decoration. The following
special protections are needed:
a.All the people enter in and out only from
one entrance which preferred to be guard by
a gatekeeper.
b.Peoples should put off the shoes and change
the soft slipper to enter the workshop.
c.The sand 、grit and mud should not be carried
to the workshops.
d.The rigid things should not be dragged and
hauled on the floor.
e.To avoid spoiling and contaminating the floor,
it is necessary for some exercises like electric
welding and painting to put some insolate
material on the exercise locale.
f.Keep watch all the time is preferred.
|
|
|